Most calls to a building materials store are of three kinds: “Is it in stock?”, “How much?” and “Can you deliver to the site?”. To answer fast, put prices, stock and delivery terms on one sheet and update it daily. On every order note eight things: product, quantity, address, unloading, day, who receives it, payment, and a read-back. Pass large wholesale orders and trade prices to a manager. If stock isn’t certain, don’t promise “yes”: take the order and say the warehouse will confirm.

The calls a store gets

CallExampleWhat you need to answer
Stock“Do you have M400 cement? And 12 mm rebar?”Today’s stock list
Price“How much a bag? And a tonne?”Prices per piece, bag, tonne, metre
Delivery“Can you bring it to Sergeli today?”Districts, price, truck type, times
Quantity“How many bags for a 50 m² floor?”The manufacturer’s stated usage
Wholesale“The site needs 20 tonnes a month”A rule for passing it to a manager
Returns“Can I return leftover tiles?”Return terms

What to write down for whoever answers

  • Prices with the unit: piece, bag, tonne, metre, square metre.
  • Today’s stock, or at least a list of “always in stock” and “to order”.
  • Delivery: which districts, the cost, the truck, unloading and carrying-up prices.
  • Opening hours, and the cut-off time for same-day delivery.
  • Payment: cash, card, bank transfer, invoices for companies.
  • Wholesale threshold: for example, orders over 5 tonnes go to a manager.

Update prices every morning. If an old price is quoted on the day it changes, the store pays the difference.

Taking an order in eight steps

  1. Product and grade: “M400 cement, 50 kg bag”.
  2. Quantity and unit: 40 bags or 2 tonnes.
  3. Address and landmark: site name, street, colour of the gate.
  4. Unloading: “Into the yard, or up to the third floor?”
  5. Delivery day and time window.
  6. Who receives it, and their phone number.
  7. Payment method.
  8. Read it all back: “Tomorrow 10 to 1, Sergeli, 40 bags of M400, unloaded. Correct?”

A read-back takes half a minute; a truck sent to the wrong address costs half a day. Always double-check the rebar diameter, cement grade and tile size: that’s where most mistakes happen.

Sample: a builder orders cement for a site

Sado: Assalomu alaykum, Poydevor building materials, Shohruh speaking.

Caller: Hello. Do you have M400 cement? How much a bag?

Sado: Yes, a 50 kg bag is 68 thousand so‘m. How many do you need?

Caller: Forty. Can you bring them to Yangi Sergeli today?

Sado: Same-day orders close at two, so it’s too late today. We can bring them tomorrow between ten and one; delivery is 150 thousand. Do they need carrying upstairs?

Caller: No, just unload in the yard. Tomorrow is fine.

Sado: Done, Otabek: tomorrow ten to one, Yangi Sergeli, forty bags of M400, unloaded in the yard. Should the driver call this number?

Caller: Yes, call me.

The prices and terms are invented. The operator didn’t promise “today”: it gave the nearest time by the store’s rule.

Handing the calls to an AI operator

In building season the phone never stops, while the salesperson is at the till or in the warehouse. An AI operator for incoming calls answers every call at once, early morning and evening too, in Uzbek or Russian. It quotes prices and terms only from your list, takes the order and transfers wholesale buyers to a manager by your rule. If it doesn’t know, it says a manager will call back and creates a task.

Orders are in the portal and download to Excel. Bitrix24 connects ready-made; 1C, MoySklad or BILLZ are connected by our team. The day before delivery, AI outbound calls confirm the order. For retail, see also: AI operator for online stores. Try it live or call 78 778 01 23.

Questions

Does the AI operator know what’s in the warehouse?

It answers from the list you give it, so keep the list current. If stock isn’t certain, it takes the order and says a staff member will confirm.

What if builders get a separate price?

Write down the rule: for whom and from what quantity. If a manager should quote wholesale prices, the operator transfers those calls to them.

Can it work out the quantity needed?

If you add the manufacturer’s usage to its facts, for example “1.5 kg per square metre”, it quotes that figure. The exact calculation is done by the builder or the salesperson.